Skip to content
Engineering World Solar Energy Solutions

Industrial Solar Solutions in Lahore

High-capacity industrial solar for factories, mills and manufacturing units in Lahore and Punjab — three-phase systems from tens of kilowatts to multiple megawatts, engineered for heavy inductive loads.

Typical range

50 kW – 1 MW+

Industrial solar in Pakistan is about scale and engineering discipline. Factories, textile mills, plastic and steel units, cold stores and large warehouses run heavy three-phase loads — motors, compressors, chillers and pumps — where a poorly designed system simply will not perform. Engineering World designs industrial rooftop and ground-mount solar around your actual load profile so generation, protection and net metering all hold up under real factory conditions.

Built for three-phase, high-demand loads

Industrial systems are built on a three-phase inverter architecture that manages balanced phase loading and the power-factor behaviour of inductive motor loads. We study your demand curve — shift timings, motor starting currents and process peaks — and size the array and inverters so solar displaces the maximum share of your daytime grid draw. Most industrial facilities need at least 30–50 kW before savings become meaningful, and many rooftops support several hundred kilowatts.

Engineering that protects your plant

  • Structural assessment of the roof or ground for panel loading and wind
  • Correctly rated DC/AC protection, isolators, SPDs and earthing
  • Cable sizing and routing that respects voltage drop and heat
  • Synchronisation with the grid and, where present, diesel generators
  • SCADA-grade monitoring for generation, faults and performance ratio

Regulatory and documentation support

Larger installations involve additional documentation — single-line diagrams, equipment datasheets, DISCO technical evaluation and, above certain thresholds, AEDB certification and NEPRA processes. We prepare and manage this paperwork so your project clears approvals without stalling production.

Net metering & net billing in Pakistan (2026)

Under NEPRA's Prosumer Regulations 2026, new grid-tied applicants are placed on a net-billing arrangement: the units your system exports to the grid are purchased at a notified buy-back rate, while the units you import are billed at your normal tariff. Existing net-metering agreements generally remain valid on their original terms until they expire. DISCO approval typically takes around 2.5–3.5 months after installation, and connections up to 1 MW on a three-phase supply are eligible to apply. We prepare the single-line diagram, equipment datasheets and application paperwork and coordinate with your DISCO (LESCO in most of Lahore) on your behalf.

Ground-mount and hybrid options

Where roof area is limited, we design ground-mounted arrays on available land. For units that cannot tolerate any interruption, hybrid architectures with storage or generator synchronisation keep critical processes stable.

Discuss your industrial project

Send us your connected load, tariff and a recent bill and we will scope a feasibility study for your facility. Request an industrial site survey to get started.

What's included

  • Three-phase design for heavy inductive loads
  • Capacities from tens of kW to MW scale
  • Structural and electrical engineering to standard
  • AEDB / NEPRA / DISCO documentation support
  • Power-factor and load-profile analysis
  • SCADA-grade monitoring and maintenance

Equipment we supply & install

Frequently asked questions

What is the minimum viable size for industrial solar?
Most industrial facilities see meaningful savings from around 30–50 kW upward. The right size depends on your connected load, shift pattern and available roof or ground area, which we assess in a feasibility study.
Can solar run heavy motors and three-phase machinery?
Solar offsets grid consumption rather than directly starting motors, and our three-phase design balances phase loading and power factor so the plant runs normally. Hybrid or generator-synchronised designs are used where processes cannot tolerate interruption.
Do industrial systems qualify for net metering?
Three-phase connections up to 1 MW can apply. Larger systems involve additional AEDB/NEPRA documentation and DISCO technical evaluation, which we manage on your behalf.
What if we do not have enough roof space?
We design ground-mounted arrays on available land, or a combination of rooftop and ground mount, to reach the required capacity.
How do you protect our existing plant and warranties?
We carry out a structural assessment, use correctly rated protection and earthing, and install structures and cabling to preserve roof integrity and equipment warranties.

Ready for a industrial solar solutions quote?

Book a free site survey in Lahore and get an itemised, no-obligation proposal designed around your load.